MANUFACTURING CAPACITY

Hard & Soft - combination board manufacturing capacity

Project

2019

2020

2021

The largest layer

18L

24L

30L

The thickest board

2.8mm

3.2mm

4mm

The largest size

500mm x 500mm

500mm x 630mm

500mm x800mm

The smallest laser hole

0.1mm

0.1mm

0.075mm

The smallest machine drilling hole

0.15mm

0.1mm

0.1mm

The largest hole diameter proportion

10:1

12:1

13:1

Inner the smallest line distance

0.075mm/0.075mm

0.05mm/0.05mm

0.04mm/0.04mm

Outer the smallest line distance

0.1mm/0.1mm

0.075mm/0.075mm

0.05mm/0.05mm

Resistance welding counterpoint tolerance

0.05mm

0.038mm

0.035mm

The smallest resistance welding bridge

0.1mm

0.08mm

0.08mm

The smallest BGA space distance

0.5mm

0.5mm

0.45mm

The smallest single line resistance welding tolerance

士10%

士10%

士7%

The smallest difference resistance welding tolerance

士10%

士10%


Base material type

General TG, Middle TG, High Tg, Halogen Free, Low Dk, Low Loss, High CTl, PTFE

Base material brand

Shengyi,ITEQ, Rogers

Surface treatmert

ENIG,ENEPIG, OSP, Gold Plating, Gold Plating+ENIG, Gold Plating +OSP,Imm SilverImm Tin, Plating Tin

High-end products

Hard&soft conbination + HDI

Mass Prodction(1+N+1)

Mass Prodction(2+N+2)

Sample Prodction(3+N+3)

PRODCTION CAPABILITY

PCB-Layer

Square Feet/month

Square meter/month

Percentage %

Multi-layer

400,000

37,161

58

Double-layer

200,000

18,580

29

Single Side/Auminum substrate

100,000

9,290

13

Total Output

700,000

65,031

100

DELIVERY TIME
  • The above time is the production time after EQ is confirmed
  • If no stock of special materials, the delivery time will be based on the raw material arrival time

Delivery

Sample

Production

Layer

Normal

Urgent

3-10m²

10-30m²

50m²以上

2l

6 days

3 days

2 weeks

3 weeks

4 weeks

4

7 days

5 days

3 weeks

3 weeks

4 weeks

6L

8 days

6 days

3 weeks

3 weeks

4 weeks

8L

9 days

6 days

3 weeks

3 weeks

4 weeks

10L

12 days

7 days

3 weeks

3 weeks

4 weeks

12L

12 days

8 days

3 weeks

3 weeks

4 weeks

1+N+1 HDI Board

15 days


4 weeks

5 weeks

5 weeks

2+N+2 HDI Board

20 days


4 weeks

5 weeks

5 weeks

3+N+3 HDI Board

25 days


5 weeks

5 weeks

5 weeks

Random interconnecton

28 days


5 weeks

5 weeks

5 weeks

Flexible&Rigid Combination

15 days


4 weeks

4 weeks

4 weeks